Here is where we left you last time with items crossed out as completed:
the final electrical bits and pieces
the final plumbing bits and pieces
the final bits of painting and finishing
the clean-up
the fixing of anything that isn’t up to scratch (don’t get me started on this one)
And here are a few other things that I forgot to add at the time:
the tiling of the patio;
the moving of the air conditioning unit;
the removal of the temporary kitchen;
the creation of the fourth bedroom out of the ex-temporary kitchen;
the re-instatement of our front fence;
and whatever else I have forgotten.
And the builder has sent his progress claim stating 96% complete. The guy is a comedian in another life, I'm sure of it.
Anyway, here are a few pictures to give an indication of the progress made.
Kitchen missing doors on the laundry section and the appliances. But with dogs. :)
Kitchen with appliances and basically lived in. Only the glass splash back and range hood to come, and any fix-ups we think they should do.
Mr O installing cables for his music system under Miss O's direction. Carpet laid and protected from last minute painting.
Living area in its current incarnation. Decorating and fussing about with layout yet to be attempted.
So, that is pretty much it as it goes for the interior. The patio is currently under tiling construction and should be finished in a couple of days. Mr O has been hard at work setting up a small (but long and very heavy) retaining wall in the back garden, so I will photograph that in the next few days too. At the moment the garden is more weed and soil oriented, but we will eventually get to having green stuff that doesn't require pulling out by the end of summer, I am sure.
Until the next update, remember, don't renovate if you want to stay sane !