The work on the house continues. It is finally hitting the speed of a rolling snowball from the movies.
We now have the guts of a carport. Our kitchen is almost totally installed, as of today. We now have a proper hallway door, it is just waiting for the glazier to come back with safety glass for the two glass panels. We also have our new "back door" installed and I have a set of keys for it. The pergola is starting to look like a real structure too.
What's still to be done:
the kitchen and dining area tiling
the living room area carpeting
the carport (concreting & roofing)
the pergola
the final electrical bits and pieces
the final plumbing bits and pieces
the final bits of painting and finishing
the clean-up
the fixing of anything that isn't up to scratch (don't get me started on this one)
and probably a bunch of other stuff that I have forgotten about.
Here are photographs from the end of last week.
The skeleton carport.
The patio without pergola.
The partly installed kitchen.
Tuesday, December 18, 2007
Subscribe to:
Post Comments (Atom)
1 comment:
[...] a let-down, but other than that everyone else made fair effort to do so. Here is where we left you last time with items crossed out as [...]
Post a Comment